Custom industrial spaces! Share the news
Discover this new development project located in Saint-Philippe, along Highway 30, at exit 62.
Designed with sustainability and energy efficiency in mind, this building includes 32 loading docks, providing an ideal setup for manufacturing, logistics, or other industrial operations.
It can be configured as one large unit or divided, with flexible layout options.
- Accessible from Highway 30
- Level of durability and energy efficiency
- 32 loading docks
- 152 parking spaces
- Storage area at up to 36 feet
- Office area with possible mezzanine
-
Total surface area
204,959 ft2 -
Surface area by floor
Coming soon -
Number of parking spaces
152 -
Elevators
Coming soon -
Number of floors
1 -
Type of building
Industrial